Project Overview

Hospitals are some of the most demanding environments for construction and maintenance projects — strict timelines, safety regulations, and the need to minimize disruption all come into play. Our team was contracted to design and build a scaffold system to support insulation crews working on overhead ductwork at an active hospital.

The project required precise planning and rapid execution to help the insulation team meet tight deadlines without compromising safety or patient operations.

The Challenge​

The work area was located outside and had limited access and clearance. With ongoing facility operations nearby, several key challenges had to be addressed:

  • Tight timelines: The insulation work had to be completed within a short maintenance window to avoid impacting hospital systems.
  • Coordination: Planning for the scaffold to accommodate multiple workers at multiple locations and elevations
  • Summer Temperature: Significant heat and humidity posed a dehydration risk to workers
  • Safety and cleanliness: Hospital standards required dust control, noise minimization, and strict adherence to safety protocols.

The Solution

To meet these challenges, our team designed and integrated multiple work platforms to all sections of ductwork all within the same footprint.

Key design and construction features included:

  • Modular scaffold bays: Configured to match the layout of the duct runs, allowing workers to reach all insulation points efficiently.
  • Efficient setup: Quick installation times, variety of sizes, configurations minimizing downtime.
  • Staying Hydrated: Our heat-stress policy went into effect: enough workers were present to allow for work rotations. Workers also had access to cool water and Gatorade
  • Containment and protection: The scaffold was enclosed to isolate the work area, maintain cleanliness, and protect the hospital environment.

Implementation

Our team completed the full scaffold installation ahead of schedule. The system was inspected and signed off for use within 24 hours, enabling the insulation crew to begin work immediately. Constant communication with the project coordinator and hospital maintenance staff ensured seamless progress.

By maintaining an adaptable approach the project stayed on track despite the confined area and complex duct layout.

Results

  • Met all time commitments: Scaffold was installed, inspected, and handed over within the client’s required timeframe.
  • Zero safety incidents: All work was completed in compliance with hospital safety standards and without disruption to facility operations.
  • Enhanced productivity: Insulators were able to access all duct areas safely and efficiently, reducing their overall installation time.
  • Positive client feedback: The project demonstrated reliability and professionalism under strict time and safety conditions.

Lessons Learned

Working within a hospital environment highlighted the importance of precise coordination and flexibility. Every aspect — from material delivery to scaffold configuration — had to be carefully managed to support both the schedule and the sensitive nature of the workspace. By maintaining clear communication, adhering to safety standards, and focusing on efficiency, our team delivered a scaffold solution that directly contributed to the project’s success.